1948 CHRYSLER

Work performed:

Put car on lift for mechanical review and estimate.

Degrease front and rear end. Remove front and rear drums for inspection: degrease, clean and paint. Install four shocks, (clean front end and paint).

Fabricate rear brake lines. Install master cylinder, rear long brake line, tie rod ends, drain oil. Remove pan, install pan gasket, replace rear main seal, work on parking brake, paint and install pan.

Scrape underside, fabricate rod for emergency brake, clean and paint brake parts, make brake lines and replace the old ones. front bearings in drums, replace wheel cylinders, grease/pack wheel bearings, change oil.

Remove pinion seal, install tranny mounts, install front left wheel cylinders. Bleed brakes, tighten master cylinder, install fuel pump and filter, install a new fan belt, heat shrink wrap generator and coil wires. Undercoat. Finish assembly brake lights.

Test drive. It runs great!!